design project-
design project
/work draft/
00 NEGOTIATIONS-
-
Meeting
-
Commercial offer
-
Agreement
01 CONCEPT -
PLAN solution
-
Drawing up the technical task ( BRIF ).
-
Layout solution with furniture and equipment arrangement.
-
Lighting equipment layout plan.
-
Electrical equipment layout plan.
-
Floor plan with floor coverings.
Interior idea
-
Development of the main idea of the interiors of the premises.
-
Presentation of concepts on mood boards / collages.
02 SKETCH PROJECT-
VISUALISATION
3D visualization of zones.
Specifications
-
Selection of furniture and decor and specification from the manufacturer.
-
Selection of lighting and electrical equipment and specification from the manufacturer.
-
Selection of decorative and finishing materials and specification from the manufacturer.
-
Selection of plumbing equipment and specification from the manufacturer.
-
Selection of built-in appliances and equipment and specification from the manufacturer.
03 WORKING PROJECT-
project composition
-
Dimensional plan.
-
Partition dismantling plan.
-
New partition installation plan.
-
Furniture and equipment arrangement plan.
-
Plumbing equipment arrangement plan.
-
Floor plan indicating floor coverings.
-
Heated floor plan indicating underfloor heating zones.
-
Ceiling plan with height marking.
-
Lighting equipment arrangement plan.
-
Electrical equipment arrangement plan.
-
Low-current system and ventilation connection plan.
-
Plan with door, window and portal markings.
-
Wall elevations
-
Finishing materials specification.
04 DESIGN PROJECT IMPLEMENTATION-
Author's supervision
-
Cost of a one-time site visit - 5,000 rubles.
-
/Not included in the project cost and paid separately/
-
The cost of a subscription for 1 calendar month based on visits once a week, agreed upon as needed.
Equipment and support
-
Purchase of equipment and support.
-
Development of built-in furniture and designer interior items.
-
/Not included in the project cost and paid separately. The cost is negotiated additionally and depends on the complexity of the task and the level of detail/
05 PHOTOGRAPHY of the interior -
-
Photography is not included in the project cost and is paid separately. The cost is negotiated additionally and depends on the complexity of the task and the level of detail/
NOTE:
All design documentation is transferred by the Contractor to the Customer in two copies, A3 format, color printing or electronically by mail.
The final cost of work under this CP and the Agreement will be agreed upon after measuring the premises and clarifying the technical specifications.
The cost of design does not include Author's supervision.
The design cost does not include work on the design of adjacent engineering sections: heating, ventilation, electricity, sewerage.